|
|

Static Project Template

- A project template is not very useful for generating estimates based upon quantities or dimensions (such as piping replacement).
- A project template usually encompasses only a few possible scenarios.
- A project template must be manually edited before every use (adding or deleting sections of tasks as required):
- time consuming
- requires planner to adjust project scheduling logic
- A project template is tied to a specific project scheduling platform.
- For Contractors -> A project template must be manually edited to account for regional differences in productivity or resource nomenclature.
|
Dynamic Estimating Module

- A dynamic estimating module is ideal for generating estimates based upon quantities or dimensions (such as piping replacement).
- A dynamic estimating module encompasses almost all possible scenarios.
- Dynamic generation every use:
- fast
- computer generates clean project scheduling logic
- A dynamic estimating module is useable with a range of project scheduling platforms.
- For Contractors -> A dynamic estimating module easily adjusts estimates and resource definitions for regional differences in productivity or resource nomenclature.
|
|
Copyright 2002-2005 © InterPlan Systems Inc. All rights reserved.