eTaskMaker Module Updates for February
InterPlan Systems has released the following updated eTaskMaker estimating modules:
- Block Valves - Bolted (Rev. 11) - (updated) Updated estimating formula for valve removal.
- Block Valve - Welded (Rev. 11) - (updated) Updated estimating formula for valve removal.
- Flanges (Rev. 3) - (updated) Improved schedule logic for tasks.
- Heat Exchanger - Fixed Tube Sheet (Rev. 7) - (updated) Revised estimates for eddy current testing.
- Heat Exchanger - Floating Head (Rev. 9) - (updated) Revised estimates for eddy current testing.
- Heat Exchanger - Reboiler (Rev. 5) - (updated) Revised estimates for eddy current testing.
- Heat Exchanger - U-Tube (Rev. 11) - (updated) Revised estimates for eddy current testing.
- Heat Exchanger - Vertical (Rev. 8) - (updated) Revised estimates for eddy current testing.
- Pipe Rack Fabrication & Erection - (new) For carbon steel pipe.
eTaskMaker clients may now download the updates from our downloads repository.