InterPlan Systems News


eTaskMaker Module Updates for May

InterPlan Systems has released the following updated eTaskMaker estimating modules:

  • Fired Heater Tubes Decoking (Rev. 2)(updated) Added scenario for using pigging method (in addition to the existing scenario for steam air decoking).
  • Fired Heater Tubes – Stuck Pig Retrieval(new) When it is not possible to dislodge a stuck pig through hydraulic action, it can be necessary to cut the tube to retrieve it.

eTaskMaker clients may now download the updates from our downloads repository.