InterPlan News


eTaskMaker Module Updates for March

InterPlan Systems has released the following updated eTaskMaker estimating modules:

  • Agitators (Rev. 5) - (updated) Updated estimating formulas for scaffolding.
  • Air Coolers (Rev. 5) - (updated) Updated estimating formulas for scaffolding.
  • Asbestos Abatement (Rev. 7) - (updated) Updated estimating formulas for scaffolding.
  • Blind Installation (Rev. 6) - (updated) Updated estimating formulas for scaffolding.
  • Block Valves - Welded [PF/BM] (Rev. 14) - (updated) Split into two modules using either pipe fitters or boilermakers.
  • Block Valves - Bolted [PF/BM] (Rev. 14) - (updated) Split into two modules using either pipe fitters or boilermakers.
  • Butterfly Valves (Rev. 4) - (updated) Updated estimating formulas for scaffolding.
  • Cable Tray Installation (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Chain Operators (Rev. 3) - (updated) Updated estimating formulas for scaffolding.
  • Check Valves - (new) Allows for re-aligning the pump after a check valve is (re)installed.
  • Coalescer - Horizontal (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Coke Drum (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Concrete Structure Repairs (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Control Valves (Rev. 9) - (updated) Major revision includes updated estimating formulas, options to send the control valve to be serviced at an outside repair shop and/or to decontaminate the valve.
  • Conveyers - Feeder Screw (Rev. 3) - (updated) Updated estimating formulas for scaffolding.
  • Conveyers - Open Belt (Rev. 2) - (updated) Updated schedule logic network.
  • Cooling Tower Gear Boxes - Fans (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Crystallizer (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Deaerator (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Desalter Feed Water Drum (Rev. 4) - (updated) Updated estimating formulas for scaffolding.
  • Desalters (Rev. 6) - (updated) Updated estimating formulas for scaffolding.
  • Drums (Rev. 11) - (updated) Updated estimating formulas for scaffolding.
  • Ejectors (Rev. 3) - (updated) Updated estimating formulas for scaffolding.
  • Fired Heater Tubes - Stuck Pig Retrieval (Rev. 1) - (updated) Updated estimating formulas for scaffolding.
  • Fired Heater Tubes Decoking (Rev. 3) - (updated) Updated estimating formulas for scaffolding.
  • Flanges [PF/BM] (Rev. 5) - (updated) Split into two modules using either pipe fitters or boilermakers.
  • Flare - In Situ (Rev. 3) - (updated) Updated estimating formulas for scaffolding.
  • Furnace - Blower (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Furnace - Stack Repairs - (new) Allows for the removal of spalled lining (refractory brick) in concrete stacks.
  • Hot Taps (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Nozzle Installation on Vessel (Rev. 6) - (updated) Improved estimating formulas; accounts for welding different metallurgies.
  • Pipe Clamps - (new) Covers all tasks to remove a pipe clamp, inspect and repair the damage.
  • Pipe - Cr(VI) - Field Erection - (new)
  • Reactor - Alkylation (Rev. 4) - (updated) Updated estimating formulas.
  • Scaffold Erection (Rev. 2) - (updated) Updated estimating formulas.
  • Tank Roof Repairs (Rev. 2) - (updated) Updated estimating formulas for scaffolding.
  • Tanks (Rev. 7) - (updated) Updated estimating formulas for scaffolding.

eTaskMaker clients may now download the updates from our downloads repository.

Leave a Reply

You must be logged in to post a comment.