InterPlan Systems News


Archive for the 'Updates Log' Category

eTaskMaker Module Updates for April

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: F.C.C. Reactor (Rev. 6) – (updated) Minor revision involving variables used in formulas for resource assignments. Heat Exchangers – U-Tubes (Rev. 31) – (updated) Improved estimating formulas. Large Cranes Mobilization – (new) Covers mobilization and demobilization (including assembly and disassembly the boom/crane) of […]

eTaskMaker Module Updates for December

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Blind Installation (Rev. 13) – (updated) Improved allocation of crane resources. Pipe – Field Erection (Rev. 17) – (updated) Improved estimating formulas for welding tasks. Refractory Remediation – (new) Covers the steps needed to remediate (fix, patch up) damaged refractory. Refractory Repairs (Rev. […]

eTaskMaker Module Updates for April

InterPlan Systems has released the following updated eTaskMaker estimating modules: BFW Preheater (Rev. 2) – (updated) Improved some of the estimating calculations for refractory repairs. Heat Exchangers – U-Tubes (Rev. 30) – (updated) Now incorporates an option for the unheading of BREECH-LOCK design exchangers. Pipe – Small Diameter Welded – Field Erection (Rev. 4) – […]

eTaskMaker Module Updates for September

InterPlan Systems has released the following updated eTaskMaker estimating module: Heat Exchangers – U-Tube (Rev. 29) – (updated) Improved some of the estimating calculations for blinding and unheading. eTaskMaker clients may now download the update from our downloads repository.

eTaskMaker Module Updates for June

InterPlan Systems has released the following updated eTaskMaker estimating modules: Heat Exchangers – Fixed Tubesheet (Rev. 17) – (updated) Improved some of the estimating calculations. Reactor Catalyst Change (Rev. 10) – (updated) Improved some of the estimating calculations. eTaskMaker clients may now download the update from our downloads repository.

eTaskMaker Module Updates for March

InterPlan Systems has released the following new eTaskMaker estimating module: Structural Steel Fabrication and Erection – (new) Allows for the fabrication and erection of structural steel (either wide flange or standard type). eTaskMaker clients may now download the update from our downloads repository. Additionally, we are developing a cross reference table to facilitate translating eTaskMaker […]

eTaskMaker Module Updates for November

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Contactor Reactor – (new) For the inspection, repair and testing of a typical DuPont STRATCO Contactor Reactor consisting of a heat exchanger with a mixing head and injection nozzles. Drums (Rev. 21) – (updated) Now incorporates an option for manual cleaning (when the […]

eTaskMaker Wizard Software Update

InterPlan Systems has released an update for the eTaskMaker Wizard containing several enhancements. The update includes a file with notes on the improvements. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems for customized updates.

eTaskMaker Module Update for September

InterPlan Systems has released the following new eTaskMaker estimating module: Injection Quill Installation – (new) For the installation of an injection quill, including a hot tap if necessary. eTaskMaker clients may now download the updates from our downloads repository.

eTaskMaker Wizard Software Update

InterPlan Systems has released a minor maintenance update for the eTaskMaker Wizard. The update includes a file with notes on the improvement. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems for customized updates.

« Previous PageNext Page »