eTaskMaker Module Updates for September
September 1st, 2010InterPlan Systems has released the following new and updated eTaskMaker estimating modules:
- Anchor Bolt Replacement - (new) Estimate/plan to replace anchor bolts in situ, without having to remove the equipment.
- Block Valves - Bolted (Rev. 18) - (updated) Improved task definition.
- Concrete Structure Repairs (Rev. 3) - (updated) Improved estimating formulas for durations.
- Furnace Radiant Section Tube Repairs (Rev. 3) - (updated) Enhancements include improved estimating formulas for welding tube bends, additional scope to include/exclude stress relieving, hardness test/hydrotest and a full range of metallurgy factors.
- Heavy Machinery Foundation Repairs - (new) For repairing cracked compressor foundations. Two methods are available: horizontal post-tensioning and vertical pinning.
- Paddle Blind Installation (Rev. 8) - (updated) Can now create multiple paddle blind installation tasks under the same work order number.
- Pipe - Small Bore (Threaded) Field Erection (Rev. 5) - (updated) Now includes heat tracing (steam/electric), insulation, plus improved duration estimating formulas.
- Pipe Spools (Bolted) - Field Erection (Rev. 1) - (updated) Now includes heat tracing (steam/electric), insulation.
eTaskMaker clients may now download the updates from our downloads repository.