ATC Professional™
Turnaround Management Software
ATC Professional™ was designed specifically for the unique demands of process industry (oil refinery, petrochemical plant, fertilizer plant, pulp & paper mill, power plant, etc.) turnarounds (shutdowns, I&Ts, revamps, debottlenecking projects, outages, etc.). ATC is an abbreviation for "Around The Clock" (because turnarounds are executed around the clock).
Turnaround Planning, Scheduling and Management
Most project management software, when used for managing turnarounds, yield unsatisfactory results. Turnarounds have unique and important characteristics that distinguish them from typical (EPC/construction) projects. Consideration for these distinctions requires a dedicated turnaround management methodology to manage them. We’ve detailed the distinguishing characteristics of turnarounds and the considerations for a dedicated turnaround management methodology in the following resources:
ATC Professional is a complete turnaround management solution that addresses the unique needs of industrial plant STOs. It is more than just another generic project management software title (CPM scheduling engine / Gantt chart reports). ATC Professional is a proactive system that incorporates procedures involving the entire turnaround management team to promote ownership and visibility of the plan, and objectivity and communication in the reporting cycle. It encourages cooperation and allows all team members to contribute and succeed.
We invite you to read excerpts from our ATC Professional manuals:
Benefits of using ATC Professional
- Develop realistic budgets with detailed cost estimate reports.
- Ensure visibility, communication and ownership of the schedule. Timely, objective and complete progress reports at the beginning of every shift ensure that management has the right information to manage effectively.
- Achieve tight, efficient, realistic schedules with Critical Path scheduling.
- Realize the lowest execution cost of the schedule with effective resource management.
- Avoid most common pitfalls that endanger time or budget goals with Critical Mass analysis.
- Qualify field productivity and improve cost forecasting with the Earned Vs. Burned report.
What Our Clients Say
“ATC has proven very effective in managing our turnarounds. It allowed us to schedule and track progress with total confidence. The Critical Mass report has proven to invaluable. This report (along with others) has allowed us to complete all work in time, with no surprises that would have otherwise caused delays.”
“We have used ATC for many years, and we can sincerely say that ATC has always proven very effective..”
“The result has been faster, neater and more accurate turnaround schedules.”
“... we are very satisfied with the ATC program, which has changed, positively, programming and controlling of shutdowns at our plant.”
“Cosmar Styrene Plant has used ATC for four turnarounds. Each of these T/A’s, as viewed from the first line supervisors to managers, has been significantly better than previous T/A’s.”
“We have successfully implemented and used ATC for our recent Turnaround and have saved more than 2 days in the over all duration.”
Our clients typically save 10-15% the first time they use ATC Professional. While we cannot guarantee such results due to the unpredictable nature of turnaround projects, we can guarantee that with ATC Professional, you will be in control and be able to manage all potential problems. With ATC Professional, a manager can prevent a $1M problem from becoming a $10M overrun.
ATC Professional consistently helps plants reduce costs and delays, start up ahead of schedule, and avoid many potentially critical problems.
So what is your next step?