InterPlan Systems News


Archive for the 'Updates Log' Category

eTaskMaker Module Updates for June

InterPlan Systems has released the following updated eTaskMaker estimating modules: Heat Exchangers – Fixed Tubesheet (Rev. 17) – (updated) Improved some of the estimating calculations. Reactor Catalyst Change (Rev. 10) – (updated) Improved some of the estimating calculations. eTaskMaker clients may now download the update from our downloads repository.

eTaskMaker Module Updates for March

InterPlan Systems has released the following new eTaskMaker estimating module: Structural Steel Fabrication and Erection – (new) Allows for the fabrication and erection of structural steel (either wide flange or standard type). eTaskMaker clients may now download the update from our downloads repository. Additionally, we are developing a cross reference table to facilitate translating eTaskMaker […]

eTaskMaker Module Updates for November

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Contactor Reactor – (new) For the inspection, repair and testing of a typical DuPont STRATCO Contactor Reactor consisting of a heat exchanger with a mixing head and injection nozzles. Drums (Rev. 21) – (updated) Now incorporates an option for manual cleaning (when the […]

eTaskMaker Wizard Software Update

InterPlan Systems has released an update for the eTaskMaker Wizard containing several enhancements. The update includes a file with notes on the improvements. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems for customized updates.

eTaskMaker Module Update for September

InterPlan Systems has released the following new eTaskMaker estimating module: Injection Quill Installation – (new) For the installation of an injection quill, including a hot tap if necessary. eTaskMaker clients may now download the updates from our downloads repository.

eTaskMaker Wizard Software Update

InterPlan Systems has released a minor maintenance update for the eTaskMaker Wizard. The update includes a file with notes on the improvement. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems for customized updates.

eTaskMaker Module Updates for August

InterPlan Systems has released the following updated eTaskMaker estimating modules: Actuators – (new) For replacement of stand-alone actuators. Coalescer – Horizontal (Rev. 5) – (updated) Now includes an option for for transporting, installing a pre-assembled scaffold in situ. Concrete Pipe – Erection Underground – (new) For excavating and installing concrete pipe underground. Crystallizer (Rev. 6) […]

eTaskMaker Module Updates for March

InterPlan Systems has released the following updated eTaskMaker estimating modules: Air Coolers (Rev. 10) – (updated) Improved estimating formulas. Asbestos Abatement (Rev. 9) – (updated) Improved estimating formulas. Blind Installation (Rev. 12) – (updated) Improved estimating formulas. Block Valves – Bolted (Rev. 25) – (updated) Improved schedule logic. Butterfly Valves (Rev. 11) – (updated) Includes […]

eTaskMaker Update Includes New Export Option for P6 v8.2

InterPlan Systems has released a minor enhancement update for the eTaskMaker Wizard that includes a new export option for P6 v8.2. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems for customized updates.

eTaskMaker Module Updates for November

InterPlan Systems has released the following updated eTaskMaker estimating modules: Block Valves – Bolted (Rev. 24) – (updated) Includes some enhancements to estimating formulas and schedule logic. Also incorporates a safety permit and allows for the specification of different types of insulation. Block Valves – Welded (Rev. 23) – (updated) Incorporates a safety permit and […]

« Previous PageNext Page »