InterPlan Systems News


Archive for the 'Updates Log' Category

eTaskMaker Module Update for October

InterPlan Systems has released the following updated eTaskMaker estimating module: Block Valve – Welded (Rev. 24) – (updated) Adds an option for valves with a rating up to 1,500 #. eTaskMaker clients may now download the update from our downloads repository.

eTaskMaker Wizard Software Update (1.0.1.1)

InterPlan Systems has released a minor update for the eTaskMaker Wizard. The Work Scope report in the eTaskMaker Wizard now displays a summary row for total manhours when the report is configured to show manhours. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems […]

eTaskMaker Module Update for August

InterPlan Systems has released the following new eTaskMaker estimating module: Cooling Tower Louvers Replacement – (new – Heat Exchangers folder) Covers the removal of old/damaged louvers on a cooling tower and replacing them with new, fiberglass reinforced plastic ones. The module also includes the necessary tasks for asbestos abatement, if necessary. Note that the removal/installation […]

eTaskMaker Module Updates for May

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: AG Centrifugal Pump Installation (Rev. 3) – (updated) Bolt Tightening Test – (new) Broken Bolts-Studs-Keys Removal (Metal Disintegration Method (Rev. 2) – (updated) Cable Tray (Standard, Metal Ladder Type) Installation (Rev. 3) – (updated) Centrifuge (Rev. 5) – (updated) Channel Head Belzona Repairs […]

eTaskMaker Module Updates for April

InterPlan Systems has released the following new and updated eTaskMaker estimating modules (the revisions consist mainly in the addition of tasks that allow the tracking and documentation of equipment release from Operations. Also, QA/QC tasks have been added as an important step in releasing the equipment back for start-up.): Agitators (Rev. 10) – (updated) BFW […]

eTaskMaker Wizard Software Update (1.0.1.0)

InterPlan Systems has released a major update for the eTaskMaker Wizard. eTaskMaker now allows you to define a set of parameters for a working calendar (days/week, shifts/day, hours/shift) and updates the Schedule Fragnet tab accordingly. You can now instantly see how many shifts/days the current estimate will require using your defined working calendar parameters. Additionally, […]

eTaskMaker Wizard Software Update (1.0.0.10)

InterPlan Systems has released an update for the eTaskMaker Wizard containing a new Work Scope report, reflecting the estimate just created. This report can be printed four different ways: Listing all detailed tasks, with durations and resources Listing just the activity tasks, with no durations and no resources Listing all detailed tasks and durations only […]

eTaskMaker Module Update for November

InterPlan Systems has released the following new eTaskMaker estimating module: Globally Sequence All Work – (new) provides convenient scheduling “anchor points” for all of your work in a turnaround. It allows planners to quickly specify start dates for groups of work by type/category as required. eTaskMaker clients may now download the update from our downloads […]

eTaskMaker Module Updates for April

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: F.C.C. Reactor (Rev. 6) – (updated) Minor revision involving variables used in formulas for resource assignments. Heat Exchangers – U-Tubes (Rev. 31) – (updated) Improved estimating formulas. Large Cranes Mobilization – (new) Covers mobilization and demobilization (including assembly and disassembly the boom/crane) of […]

eTaskMaker Module Updates for December

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Blind Installation (Rev. 13) – (updated) Improved allocation of crane resources. Pipe – Field Erection (Rev. 17) – (updated) Improved estimating formulas for welding tasks. Refractory Remediation – (new) Covers the steps needed to remediate (fix, patch up) damaged refractory. Refractory Repairs (Rev. […]