InterPlan Systems News


eTaskMaker Module Updates for February

InterPlan Systems has released the following updated and new eTaskMaker estimating modules:

  • Anchor Bolt Replacement (Rev. 1)(updated) Incorporates tasks for heating up a foundation prior to epoxy grout repairs, plus productivity adjustments for cold stress (working exposed to low temperatures).
  • BFW Preheater(new) Includes most typical boiler maintenance work.
  • Console Panel(new) Allows the preparation of PM work scope for a console panel.
  • Limit Switches(new) Allows for servicing limit switches.
  • Programmable Logic Controller(new) Covers the PM work on programmable logic controllers.
  • Pumps – Centrifugal (Rev. 10)(updated) Now incorporates tasks for megger testing of pump motors.
  • Solenoid Valves(new) Covers the replacement of solenoid valves.
  • Speed Tachometer Replacement(new) Covers the replacement of a speed tachometer.
  • Transformer – Sealed Type(new) Allows for the preparation of an estimate for megger, leak and trip mechanism test for a sealed type transformer.
  • Trip Switches(new) Allows the preparation of PM work scope for trip switches.

eTaskMaker clients may now download the updates from our downloads repository.