eTaskMaker Module Updates for February

InterPlan Systems has released the following updated eTaskMaker estimating modules:

  • Air Coolers (Rev.3)(updated) Added a factor for hazardous environmental conditions. Also corrected scaffolding dismantling formula, and tasks for chemical foam cleaning of the outside diameter of the tubes.
  • Concrete Structure Repairs (Rev.1)(updated) Improved estimating formulas.
  • Control Valves (Rev.7)(updated) Added tasks for disconnecting/reconnecting steam
    tracing.
  • Desalter Feed Water Drum (Rev. 2)(updated) Added a factor for hazardous environmental conditions. Also corrected scaffolding dismantling formula.
  • F.C.C. Reactor (Rev.2)(updated) Now includes tasks for the installation of a derrick
    crane; also improved refractory repair estimating formulas.
  • Heat Exchanger Bundle Tubesheet Cladding(new) For applying a protective expoxy coating to the tube sheets of a heat exchanger bundle.
  • Hot Taps(new) Install fittings or valves on an operating pipeline.
  • Pipe – Field Erection (Rev. 6)(updated) Re-added tasks for removing blinds that were missing in Rev. 5
  • Piping – Flare Line Replacement (Rev. 2)(updated) Improved estimating formulas.
  • Refractory Repairs(new) Major new module for estimating refractory repairs using inspection report details.
  • Vessel Erection (Rev.5)(updated) Added tasks to remove trunnions/lifting lugs.
  • Waste Heat Boiler (Rev.2)(updated) Added a factor for hazardous environmental conditions. Also corrected scaffolding dismantling formula.

eTaskMaker clients may now download the updates from our downloads repository.